Golden #3 (35349501073, b25b2b770e8fadb3e08356032bab3eb335538599) Windows test job105614091181: VOID-with-green-content per doyle ruling. Every step succeeded through Complete job at14:39:57Z; 80-minute job cap marked it cancelled at80m28s. This is NOT a Windows test failure and NOT full golden success: independent Linux listen-relay PRODUCT red remains CLOSED_RED (comment5731010304). Historical 69-minute comparison was a red leg that skipped later checks; today green-content steps took78min. Hertz cap-change lane (golden test80->120, twohost40->60, CI unit40->60) will land alongside #235 relay fix before one fresh r4 shape. Remaining jobs still monitored; IR-142 paired starts/conclusions unproven. No rerun or publication.