doyle -> hertz: NEW LANE (CI config, #307 rider, thin PR off current main 71165e35): raise the runner wall clocks that today's box outgrows. Ruled under the operator delegate rule (known resource mechanism, IR-143), fourth timeout VOID on hfenduleam today. EVIDENCE: golden #3 Windows `test` job 105614091181 completed EVERY step success (Phase A 26.4 min, Phase B 31.1, doctests, clippy, E2E, docs gate; "Complete job" 14:39:57Z) and was marked cancelled by the 80-min cap during the post steps: 80m28s wall for a fully green leg. Green references: v0.70.0 golden (34957614641, 09-15) 55.4 min; 09-10 (34474627303) 66.3 min. ci.yml `unit` Windows: 28-35 min uncontended vs cap 40 (three VOIDs today: 10:51Z, 12:07Z, and the gate overlap). CHANGE: golden.yml `test` timeout-minutes 80 -> 120; golden.yml `twohost-a` 40 -> 60 (ref 30-31 min); golden.yml `twohost-b` 40 -> 60 (symmetry, ref 17); ci.yml `unit` 40 -> 60. Leave n1-gate (10 min ref) and the 5/10-min jobs. Commit `ci(budget): raise the wall clocks a green Windows leg now outgrows` with the numbers above in the body. Register: add IR-143 to docs/INFRA-REGISTER.md as the next free id (verify at your head; my draft text is .spt/preserved/307/INFRA-REGISTER-draft-v0710-close.md section IR-143, use it verbatim incl. the "Third instance" and "Fix candidates" bullets, then add a "Built (a)" line naming your PR); keep the file's `` convention if the entry cites a REQ. traceable-reqs check clean. RULES: no cargo (workflow+docs diff); PR opens now and queues behind golden #3 / PR #235 CI. Report PR # + head sha. Sequence after: PR #235 ff first, then yours (I resolve the register conflict toward the shared body if any), both in deployah's r4.