phase: 06.3
plan: "15"
subsystem: prediction
tags: [client, reconciliation, idle-convergence]
provides:
  - "D-58 idle convergence closure note"
affects: [phase-06.3, D-58, ReconcileEngine]
key-files:
  created: []
  modified:
    - apps/client/src/prediction/reconciler.ts
requirements-completed:
  - REQ-SRV-14
  - REQ-CLI-08
duration: 7 min
completed: 2026-05-14
---

# Phase 06.3 Plan 15: D-58 Idle Convergence Summary

**No separate idle guard was added: the reconciler has no idle skip, and D-58 is expected to converge through the D-57 tween fix.**

## Accomplishments

- Added an in-code note documenting that idle snapshots use the same reconciliation path as motion snapshots.
- Confirmed the D-57 `tweenTo` fix makes the existing lerp path operational.

## Task Commits

1. **Task 1/2: D-58 convergence note** - `c8119c9` (`fix(06.3-15)`)

## Verification

- `pnpm --filter @rebno/client test --run` - PASS, 26 test files passed, 191 tests passed, 4 todo.
- `pnpm --filter @rebno/client typecheck` - PASS.

## Not Run

- Staging idle convergence UAT was not run in this local pass. Wave-2 staging verification must confirm `window.__rebno.lastReconcileDist <= 3` after idle.

---
*Phase: 06.3*