# Phase 06.2 Plan 11 — Verification Summary

**Verdict:** NOT APPROVED. Cycle-4 UAT on staging `688d334` produced `uat-fail`
per plan 06.2-11 task-2 resume-signal. Phase 06.2 closes with carry list to
Phase 06.3.

## What landed (W1 + W2)

- W1 spike: 06.2-03 D-52 reconciler diagnostics (lerp-correction / divergence-threshold / spawn-init)
- W2a parallel: 06.2-07 (D-45 nameplate fix), 06.2-08 (D-50 BL-05 evict)
- W2b serial: 06.2-05 (D-40 H1 room_layout on-join), 06.2-06 (D-41 axis-held wiring), 06.2-09 (D-51 replace-session), 06.2-10 (D-53 spawn delay)
- Protocol version bumped 2 → 3 (events.ts force_reset variant)
- 4 new e2e gates authored under `apps/client/test/e2e/`

## UAT outcome

| Outcome  | Findings                                                                                |
| -------- | --------------------------------------------------------------------------------------- |
| PASS (3) | D-41 local anim, D-50 ghost cleanup, D-52 no resets observed                            |
| FAIL (5) | D-40 partial (collision extent), D-45 regressed (overshoot+flicker+depth), D-51 regressed (both-tabs crash), D-53 not-visible, plus 5+ e2e gate failures cascading |
| NEW (3)  | D-54 collision-grid-vs-floor extent mismatch, D-55 teleport anim missing, D-56 chat readability |

## Milestone video

DEFERRED. `06.2-CLI-08-milestone.mp4` not captured. Will be captured at Phase 06.3 close instead.

## Phase 06.3 status

NEEDED. See `06.2-VERIFICATION.md` carry table for scope.

## Files

- [06.2-VERIFICATION.md](./06.2-VERIFICATION.md) — verbatim verdict + per-test results + carry-list
- [06.2-UAT-FINDINGS-2026-05-13.md](./06.2-UAT-FINDINGS-2026-05-13.md) — prior cycle-3 findings (kept for reference)

## Self-Check

- FOUND: 06.2-VERIFICATION.md authored with verdict=not-approved + 11-row test-result table + 10-row finding-closure table
- FOUND: All 6 W2 SUMMARY.md files referenced via relative links
- FOUND: D-54/D-55/D-56 new findings enumerated with NEW source designation
- FOUND: CLI-08 milestone video deferral noted
- FOUND: Phase 06.3 carry-list complete